2009 Data Tables

The Corporate Responsibility Data Tables are an indicator supplement to the Kinross 2009 Corporate Responsibility Report. Prepared in accordance with the Global Reporting Initiative G3 guidelines, the Data Tables consist of a summary of corporate and regional performance. Site specific information is reported for the fiscal years ended December 31 for 2008 and 2009 and, where available, includes 2005, 2006 and 2007 performance data.

In this report, performance is reported based on Kinross’ share of ownership except for indicators pertaining to tonnes of ore processed, gold production, safety performance and land use which are all reported on a 100% basis. Data for environmental indicators is reported on a 75% basis for Kupol, 50% for Round Mountain, and 50% for Crixás, which is operated by Anglo Gold Ashanti and which Kinross is including in this report for the first time. Frequency rates in all safety data are per 200,000 hours worked.

As a result of ongoing efforts to improve reporting, some minor changes to previously reported values have been made. These are largely the result of better reporting from the operating sites, as well as the implementation of standardized reporting protocols.

To learn more about our past performance, see the 2007 Kinross Corporate Responsibility Report on our web site at www.kinross.com.

                 
Performance Summary – Corporate
  2009   2008 2007 2006 2005
 
Ore Processed (Tonnes)1 103,423,000   92,734,000 82,831,000 89,756,000 97,941,000  
Attributable2 Gold Production (Gold equivalent ounces) 2,238,665   1,838,038 1,589,321 1,476,329 1,608,805  
 
1 Represents 100% basis of tonnes of ore processed.
2 “Attributable” includes Kinross’ share of Kupol production (75%) only.
 
Safety
 
Fatalities (Number) 2   2 1 0 0  
Lost-time Injury Frequency Rate 0.18   0.69 0.62 0.45 0.53  
Restricted Work Activity Frequency Rate 0.17   0.42 0.10 0.43 0.62  
Medical Treatment Frequency Rate 0.71   0.65 0.64 0.66 0.84  
 
Environmental
 
General (100% basis)              
  Number of Regulatory Actions 8   2 3 0 0  
  Fines Paid (US$) 149,850   840 27,919 0 0  
  Number of Reportable Releases 2   0 3 1 1  
 
Energy/Greenhouse Gas              
  Total Energy Consumption in Gigajoules 9,240,000   7,476,000 5,810,000 5,387,000 5,302,000  
  Direct Energy Consumption in Gigajoules 4,921,000   4,591,000 3,303,000 2,855,000 2,845,000  
  Indirect Energy Consumed in Gigajoules 4,319,000   2,884,000 2,507,000 2,533,000 2,457,000  
  Energy Consumed per Tonne Ore              
    Processed (Megajoules/Tonne) 97   92 77 68 79  
  Greenhouse Gas Emissions (Tonnes) 798,000   684,000 547,000 521,000 505,000  
  Greenhouse Gas Emissions per Tonne              
    of Ore Processed (Kilograms/Tonne) 8.5   9.3 8.5 7.7 7.5  
 
Water Use3              
  Total Water Withdrawn – Groundwater (m3) 9,373,000   9,043,000 8,218,000 6,615,000 6,055,000  
  Total Water Withdrawn – Surface Water (m3) 12,940,000   9,837,000 17,162,000 3,823,000 4,324,000  
  Total Precipitation Captured (m3) 16,219,000   10,383,000 11,378,000 11,582,000 14,765,000  
  Total Water Consumed in Ore Processing (m3) 32,714,000   23,899,000 20,781,000 15,192,000 15,699,000  
  Water Consumed per Tonne of Ore              
    Processed (Litres/Tonne) 352   325 315 215 223  
  Total Water Discharged – Groundwater (m3) 1,179,000   1,235,000 890,000 951,000 634,000  
  Total Water Discharged – Surface Water (m3) 1,132,000   1,011,000 939,000 1,353,000 1,291,000  
 
3 Because of the remote location of most operations municipal water use is minimal and not reported.
 
Significant Materials Use              
  Diesel Fuel (m3) 122,100   118,800 87,100 75,400 74,800  
  Cyanide (Tonnes as CN) 8,050   7,288 6,130 5,780  
  Lime (Tonnes) 54,072   72,815 79,854 88,264  
  Blasting Agents (Tonnes) 34,047   30,799 22,467 22,837  
 
Wastes              
  Waste Rock Mined (Tonnes) 83,081,000   76,178,000 83,420,000 88,552,000 79,057,000  
  Tailings Produced (Tonnes) 60,241,000   40,464,000 35,186,000 35,644,000 34,794,000  
  Hazardous Waste Disposed Onsite (Tonnes) 654,419   298,738 251,889 276,417 279,983  
  Hazardous Waste Disposed Offsite (Tonnes) 306   369 133 69 55  
  Non-hazardous Waste Disposed Onsite (Tonnes) 5,520   6,034 4,639 3,644 1,207  
  Non-hazardous Waste Disposed Offsite (Tonnes) 1,566   447 239 188 145  
 
Land Status (100% basis)4              
  New Reclamation (hectares) 170   75 105 29 40  
  Previously Reclaimed (hectares) 2,271   2,196 2,226 1,319 1,271  
  New Disturbance (hectares) 680   474 1,070 252 790  
  Previously Disturbed and Unreclaimed (hectares) 6,117   5,814 4,576 5,098 4,454  
  Protected Habitat (hectares) 3,670   1,761 1,761 784 569  
 
4 Includes current operations and closed sites.
 
Regional Information – USA Operations
Operations 2009   2008 2007 2006 2005
 
Fort Knox              
  Mining Method: Open Pit              
  Processing Method: Carbon-in-pulp (CIP), gravity, heap leach              
  Employees 484   421 390 390 420  
  Contractors 0   112 39 25 22  
  Ore Processed (Tonnes)5 16,224,000   13,769,000 12,722,000 13,462,000 13,050,000  
  Gold Production (Gold equivalent ounces) 263,260   329,105 338,459 333,383 329,320  
 
5 Represents 100% basis of tonnes of ore processed.
 
Round Mountain              
  Mining Method: Open Pit              
  Processing Method: Heap leach, carbon-in-leach (CIL), gravity              
  Employees 731   705 708 677 658  
  Contractors 0   88 45 56 40  
  Ore Processed (Tonnes)6 30,035,000   37,368,000 36,990,000 43,436,000 61,696,000  
  Gold Production (Gold equivalent ounces) 213,916   246,946 302,971 335,115 373,947  
 
6 Represents 100% basis of tonnes of ore processed.
 
Kettle River-Buckhorn              
  Mining Method: Underground              
  Processing Method: Carbon-in-leach              
  Employees 195   134 99 53 52  
  Contractors 98   80 89 26 0  
  Ore Processed (Tonnes)7 282,000   77,000 0 0 n/r  
  Gold Production (Gold equivalent ounces) 173,555   27,036 0 0 68,146  
 
7 Represents 100% basis of tonnes of ore processed.
n/r = not reported
 
Safety
 
  Fatalities (Number)              
    Fort Knox 0   0 0 0 0  
    Round Mountain 0   0 0 0 0  
    Kettle River 0   0 0 0 0  
  Lost-time Injury Frequency Rate              
    Fort Knox 0.28   0.17 0.00 1.47 0.20  
    Round Mountain 0.00   0.49 0.25 0.12 0.00  
    Kettle River 0.32   1.04 1.19 1.70 0.00  
  Restricted Work Activity Frequency Rate              
    Fort Knox 1.52   0.68 0.68 2.10 1.84  
    Round Mountain 0.12   0.49 0.37 0.00 0.27  
    Kettle River 0.00   0.00 0.00 0.00 0.00  
  Medical Treatment Frequency Rate              
    Fort Knox 0.28   0.34 0.90 2.10 1.02  
    Round Mountain 0.99   0.49 1.23 0.37 1.23  
    Kettle River 0.00   0.52 0.00 0.00 0.00  
 
Environmental
 
General (100% basis)              
  Number of Regulatory Actions              
    Fort Knox 0   0 0 0 0  
    Round Mountain 0   0 0 0 0  
    Kettle River 4   1 1 0 0  
    Other 2   1 0 0 0  
  Fines Paid (US$)              
    Fort Knox 0   0 0 0 0  
    Round Mountain 0   0 0 0 0  
    Kettle River 40,000   840 0 0 0  
    Other 35,000 8  0 0 0 0  
  Number of Reportable Releases              
    Fort Knox 0   0 0 0 0  
    Round Mountain 0   0 0 0 0  
    Kettle River 0   0 1 0 0  
 
8 Fine received at closed operation DeLamar, see Responsibility Report for detail.
 
Energy/Greenhouse Gas              
  Total Energy Consumption in Gigajoules              
    Fort Knox 2,223,000   2,216,000 1,925,000 1,941,000 1,970,000  
    Round Mountain 1,205,000   1,193,000 1,189,000 1,115,000 1,085,000  
    Kettle River 286,000   128,000 48,500 35,400 136,000  
  Direct Energy Consumption in Gigajoules              
    Fort Knox 1,334,000   1,301,000 1,019,000 993,000 1,050,000  
    Round Mountain 929,000   892,000 879,000 808,000 782,000  
    Kettle River 168,000   81,800 15,600 6,600 34,400  
  Indirect Energy Consumed in Gigajoules              
    Fort Knox 889,000   914,000 906,000 948,000 921,000  
    Round Mountain 276,000   301,000 309,000 307,000 304,000  
    Kettle River 118,000   46,300 32,900 28,800 102,000  
  Energy Consumed per Tonne Ore Processed              
    (Megajoules/Tonne)              
    Fort Knox 137   161 151 144 151  
    Round Mountain 80   64 64 51 35  
    Kettle River 1,014   1,660 302  
  Greenhouse Gas Emissions (Tonnes)              
    Fort Knox 237,000   239,000 217,000 221,000 220,000  
    Round Mountain 101,000   102,000 102,000 96,100 92,900  
    Kettle River 25,800   11,300 5,100 3,900 14,600  
  Greenhouse Gas Emissions per Tonne              
    of Ore Processed (Kilograms/Tonne)              
    Fort Knox 14.6   17.4 17.0 16.4 16.9  
    Round Mountain 6.7   5.4 5.5 4.4 3.0  
    Kettle River 91.6   146.3 32.6  
 
Water Use
  Total Water Withdrawn – Groundwater (m3)              
    Fort Knox 1,872,000   1,465,000 1,890,000 2,188,000 1,169,000  
    Round Mountain 3,067,000   3,497,000 3,882,000 3,454,000 3,810,000  
    Kettle River 169,000   150,000 7,500 10,900 65,400  
  Total Water Withdrawn – Surface (m3)              
    Fort Knox 1,644,000   1,008,000 1,316,000 1,192,000 1,348,000  
    Round Mountain 0   0 0 0 0  
    Kettle River 0   0 0 0 0  
  Total Precipitation Captured (m3)              
    Fort Knox 1,253,000   613,000 528,000 506,000 337,000  
    Round Mountain 77,000   59,000 n/r n/r n/r  
    Kettle River 91,000   106,000 56,000 97,000 82,000  
  Total Water Consumed in Ore Processing (m3)              
    Fort Knox 1,721,000   1,008,000 1,192,000 1,823,000 1,686,000  
    Round Mountain 1,677,000   1,393,000 1,336,000 2,150,000 2,855,000  
    Kettle River 154,000   127,000 0 0 51,400  
  Water Consumed per Tonne of Ore Processed (Litres/Tonne)              
    Fort Knox 106   73 94 135 129  
    Round Mountain 112   75 72 99 93  
    Kettle River 547   1,648 114  
  Total Water Discharged – Groundwater (m3)              
    Fort Knox 0   0 0 0 0  
    Round Mountain 641,000   737,000 688,000 749,000 432,000  
    Kettle River 129,000   89,000 0 0 0  
  Total Water Discharged – Surface Water (m3)              
    Fort Knox 0   0 0 0 0  
    Round Mountain 0   0 0 0 0  
    Kettle River 0   22,500 0 0 0  
 
n/r = not reported
 
Land Status (100% basis)
  New Reclamation (hectares)              
    Fort Knox 13   0 12 21 4  
    Round Mountain 0   0 0 0 0  
    Kettle River 24   7 23 0 0  
    Closed Operations 8   37 70 8 36  
  Previously Reclaimed (hectares)              
    Fort Knox 37   37 25 4 0  
    Round Mountain 217   217 253 280 280  
    Kettle River 42   35 12 12 4  
    Closed Operations 1,138   1,101 1,031 1,023 987  
  New Disturbance (hectares)              
    Fort Knox 135   125 52 48 771  
    Round Mountain 0   1 1 108 0  
    Kettle River 7   50 2 2 0  
    Closed Operations 0   0 0 0 0  
  Previously Disturbed (hectares)              
    Fort Knox 1,328   1,216 1,164 1,128 378  
    Round Mountain 2,036   2,035 1,790 1,547 1,655  
    Kettle River 101   76 81 102 110  
    Closed Operations 76   84 121 191 199  
  Protected Habitat (hectares)              
    Kettle River 212   212 212 212 0  
 
Significant Materials Use
  Diesel Fuel (m3)              
    Fort Knox 36,400   35,500 27,800 27,100 28,600  
    Round Mountain 24,300   22,900 22,700 20,900 20,200  
    Kettle River 3,200   1,500 400 200 900  
  Cyanide (Tonnes as CN)              
    Fort Knox 541   373 334 373 372  
    Round Mountain 1,914   1,621 1,890 1,811 917  
    Kettle River 534   43 0 0 n/r  
  Lime (Tonnes)              
    Fort Knox 2,914   146 3,408 2,918 2,727  
    Round Mountain 19,201   20,427 30,194 32,197 0  
    Kettle River 515   124 0 0 n/r  
  Blasting Agents (Tonnes)              
    Fort Knox 8,950   9,626 7,902 8,490 530  
    Round Mountain 5,555   6,876 5,720 5,188 243  
    Kettle River 663   238 210 0 n/r  
 
n/r = not reported
 
Wastes
  Waste Rock Mined (Tonnes)              
    Fort Knox 36,200   14,551,000 21,700,000 31,751,000 40,061,000  
    Round Mountain 20,040,000   20,658,000 23,717,000 19,014,000 5,807,000  
    Kettle River 255,000   143,000 406 0 37,100  
  Tailings Produced (Tonnes)              
    Fort Knox 12,830,000   12,191,000 12,275,000 13,348,000 12,940,000  
    Round Mountain 1,701,000   1,774,000 1,774,000 1,672,000 1,689,000  
    Kettle River 282,000   78,700 0 0 252,000  
  Hazardous Waste Disposed Onsite (Tonnes)              
    Fort Knox 0   0 0 0 0  
    Round Mountain 0   0 0 0 0  
    Kettle River 0   0 0 0 0  
  Hazardous Waste Disposed Offsite (Tonnes)              
    Fort Knox 4.9   1.5 2.3 0.1 2.9  
    Round Mountain 7.7   9.7 7.0 7.8 6.0  
    Kettle River 4.1   2.8 0.3 0.3 0.3  
  Non-hazardous Waste Disposed Onsite (Tonnes)              
    Fort Knox 33.6   23.1 25.3 4.1 27.3  
    Round Mountain 857.5   204.0 217.3 215.8 183.0  
    Kettle River 0   0 0 0 0  
  Non-hazardous Waste Disposed Offsite (Tonnes)              
    Fort Knox 108.0   31.3 64.2 26.3 37.7  
    Round Mountain 0.5   11.7 12.6 11.3 10.0  
    Kettle River 263.0   165.0 n/r n/r n/r  
 
n/r = not reported
 
Regional Information – South American Operations
Operations 2009   2008 2007 2006 2005
 
Paracatu (Brazil)
  Mining Method: Open Pit              
  Processing Method: Flotation, carbon-in-leach, gravity              
  Employees 827   673 603 615 543  
  Contractors 434   1,351 3,284 654 523  
  Ore Processed (Tonnes)9 39,744,000   20,307,000 19,285,000 18,137,000 16,945,000  
  Gold Production (Gold equivalent ounces) 354,396   188,156 174,987 174,254 180,522  
Crixás (Brazil) 50% owned
  Mining Method: Underground              
  Processing Method: Gravity, Merrill-Crowe              
  Employees 904   n/r n/r n/r n/r  
  Contractors 502   n/r n/r n/r n/r  
  Ore Processed (Tonnes)10 1,036,000   n/r n/r n/r n/r  
  Gold Production (Gold equivalent ounces) 74,654   n/r n/r n/r n/r  
Maricunga (Chile)
  Mining Method: Open Pit              
  Processing Method: Heap leach              
  Employees 452   431 406 398 418  
  Contractors 922   425 537 454 720  
  Ore Processed (Tonnes)11 15,613,000   15,027,000 13,691,000 14,721,000 5,800,000  
  Gold Production (Gold equivalent ounces) 233,585   221,882 205,750 116,868 30,580  
La Coipa (Chile)
  Mining Method: Open Pit              
  Processing Method: Mill, Merrill-Crowe              
  Employees 402   424 n/r n/r n/r  
  Contractors 564   548 n/r n/r n/r  
  Ore Processed (Tonnes)12 4,907,000   4,918,427 3,546,000 5,126,000 6,496,000  
  Gold Production (Gold equivalent ounces) 231,169   226,293 197,554 155,180 125,991  
 
9, 10, 11, 12 Represents 100% basis of tonnes of ore processed.
n/r = not reported
 
Regional Performance Statistics – South America
Safety 2009   2008 2007 2006 2005
 
  Fatalities (Number)
    Paracatu 0   0 0 0 0
    Crixás 0   1 1 0 0  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
    Fruta Del Norte 0    
    Lobo-Marte 0    
  Lost-time Injury Frequency Rate
    Paracatu 0.07   0.50 0.31 0.07 0.31  
    Crixás 0.14   n/r n/r n/r n/r    
    Maricunga 0.26   1.53 1.50 0.75 0.86  
    La Coipa 0.43   0.59 n/r n/r n/r  
    Fruta Del Norte 0.00    
    Lobo-Marte 0.00    
  Restricted Work Activity Frequency Rate
    Paracatu 0.00   0.71 0.03 0.07 0.00  
    Crixás 0.00   n/r n/r n/r n/r  
    Maricunga 0.00   0.00 0.00 0.00 0.00  
    La Coipa 0.00   0.00 n/r n/r n/r  
    Fruta Del Norte 0.41    
    Lobo-Marte 0.00    
  Medical Treatment Frequency Rate
    Paracatu 0.72   0.41 0.49 0.29 0.69
    Crixás 1.58   n/r n/r n/r n/r  
    Maricunga 0.00   0.19 0.35 0.75 0.17  
    La Coipa 0.32   0.49 n/r n/r n/r  
    Fruta Del Norte 0.81    
    Lobo-Marte 0.00    
 
n/r = not reported
 
Environmental
 
General (100% basis)              
  Number of Regulatory Actions
    Paracatu 1   0 0 0 0  
    Crixás 0   0 0 0 0  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 1 0 0  
    Other 1   0 0 0 0  
  Fines Paid
    Paracatu 74,850   0 0 0 0  
    Crixás 0   0 0 0 0  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 22,800 0 0  
  Number of Reportable Releases
    Paracatu 0   0 0 0 1  
    Crixás 0   0 0 0 0  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
 
Energy/Greenhouse Gas
  Total Energy Consumption in Gigajoules              
    Paracatu 2,802,000   1,183,000 1,081,000 1,044,000 1,026,000  
    Crixás 84,200   68,800 n/r n/r n/r  
    Maricunga 981,000   852,000 748,000 750,000 531,000  
    La Coipa 978,000   947,000 504,000 537,000 553,000  
  Direct Energy Consumption in Gigajoules              
    Paracatu 575,000   385,000 330,000 323,000 313,000  
    Crixás 84,100   68,700 n/r n/r n/r  
    Maricunga 687,000   563,000 468,000 475,000 406,000  
    La Coipa 463,000   412,000 242,000 256,000 260,000  
  Indirect Energy Consumed in Gigajoules              
    Paracatu 2,227,000   799,000 751,000 721,000 712,000  
    Crixás 134   111 n/r n/r n/r  
    Maricunga 294,000   289,000 279,000 275,000 126,000  
    La Coipa 515,000   535,000 262,000 281,000 293,000  
  Energy Consumed per Tonne Ore Processed              
    (Megajoules/Tonne)              
    Paracatu 70   58 56 58 61  
    Crixás 163   341 n/r n/r n/r  
    Maricunga 63   57 55 51 92  
    La Coipa 199   193 284 210 170  
  Greenhouse Gas Emissions (Tonnes)              
    Paracatu 188,000   82,900 79,400 76,700 75,300  
    Crixás 4,800   4,000 n/r n/r n/r  
    Maricunga 89,300   79,400 70,800 70,500 45,400  
    La Coipa 102,000   100,000 52,100 55,900 57,300  
  Greenhouse Gas Emissions per Tonne              
    of Ore Processed (Kilograms/Tonne)              
    Paracatu 4.7   4.1 4.1 4.2 4.4  
    Crixás 9.3   19.7 n/r n/r n/r  
    Maricunga 5.7   5.3 5.2 4.8 7.8  
    La Coipa 20.7   20.4 29.4 21.8 17.6  
 
n/r = not reported
 
Water Use
  Total Water Withdrawn – Groundwater (m3)              
    Paracatu 29,300   32,600 32,600 32,600 32,600  
    Crixás 29,500   n/r n/r n/r n/r  
    Maricunga 2,216,000   2,007,000 1,628,000 37,500 0  
    La Coipa 2,002,000   1,785,000 779,000 892,000 977,000  
  Total Water Withdrawn – Surface Water (m3)              
    Paracatu 11,067,000   8,503,000 15,846,000 2,631,000 2,975,000  
    Crixás 0   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
  Total Precipitation Collected (m3)              
    Paracatu 14,310,000   9,201,000 10,794,000 10,979,000 14,356,000  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga n/r   n/r n/r n/r n/r  
    La Coipa n/r   n/r n/r n/r n/r  
  Total Water Consumed in Ore Processing (m3)              
    Paracatu 25,377,000   17,704,000 15,846,000 8,981,000 9,518,000  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 2,174,000   2,201,000 1,870,000 1,555,000 821,000  
    La Coipa 988,000   1,326,000 537,000 683,000 767,000  
  Water Consumed per Tonne of Ore Processed              
    (Litres/Tonne)              
    Paracatu 639   872 822 495 562  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 139   146 137 106 142  
    La Coipa 201   270 303 266 236  
  Total Water Discharged – Groundwater (m3)              
    Paracatu 0   0 0 0 0  
    Crixás 0   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 408,000   409,000 202,000 202,000 202,000  
  Total Water Discharged – Surface Water (m3)              
    Paracatu 1,051,000   965,000 901,000 1,353,000 1,291,000  
    Crixás 79,400   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
 
n/r = not reported
 
Land Status (100% basis)
  New Reclamation (hectares)              
    Paracatu 113   25 142 0 0  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
  Previously Reclaimed (hectares)              
    Paracatu 167   142 0 0 0  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
  New Disturbance (hectares)              
    Paracatu 345   277 84 74 0  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 11   0 0 0 0  
    La Coipa 21   21 24 20 19  
  Previously Disturbed (hectares)              
    Paracatu 1,448   1,284 1,225 1,293 1,293  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 735   735 735 735 735  
    La Coipa 167   147 122 103 84  
  Protected Habitat (hectares)              
    Paracatu 3,428   1,519 1,519 542 542  
    Maricunga 27   27 27 27 27  
    La Coipa 3   3 3 3 0  
 
n/r = not reported
 
Significant Materials Use
  Diesel Fuel (m3)              
    Paracatu 9,000   9,000 9,000 8,800 8,500  
    Crixás 1,700   1,500 n/r n/r n/r  
    Maricunga 17,000   13,700 11,100 11,500 9,600  
    La Coipa 12,500   11,100 6,500 6,900 7,000  
  Cyanide (Tonnes as CN)              
    Paracatu 590   251 280 370 410  
    Crixás 164   n/r n/r n/r n/r  
    Maricunga 2,460   2,967 2,563 2,225 746  
    La Coipa 1,307   1,697 4,815 7,494 8,092  
  Lime (Tonnes)              
    Paracatu 5,800   2,492 1,718 1,427 n/r  
    Crixás 473   n/r n/r n/r n/r  
    Maricunga 2,435   32,380 39,719 44,230 6,676  
    La Coipa 12,698   11,113 4,815 7,494 8,092  
  Blasting Agents (Tonnes)              
    Paracatu 5,992   897 38 88 0  
    Crixás 635   n/r n/r n/r n/r  
    Maricunga 6,546   8,295 6,265 5,998 3,792  
    La Coipa 3,593   3,370 1,232 3,073 n/r  
 
n/r = not reported
 
Wastes
  Waste Rock Mined (Tonnes)              
    Paracatu 2,290,000   160,000 0 0 0  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 10,988,000   10,793,000 10,750,000 11,154,000 4,661,000  
    La Coipa 10,434,000   7,889,000 5,457,000 8,771,000 11,826,000  
  Tailings Produced (Tonnes)              
    Paracatu 39,090,000   20,917,000 19,033,000 17,861,000 16,665,000  
    Crixás 497,000   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 4,984,000   5,047,000 2,103,000 2,763,000 3,248,000  
  Hazardous Waste Disposed Onsite (Tonnes)              
    Paracatu 654,419   298,738 251,889 276,417 279,983  
    Crixás 0   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
  Hazardous Waste Disposed Offsite (Tonnes)              
    Paracatu 222.1   131.8 26.2 30.3 25.7  
    Crixás 0   n/r n/r n/r n/r  
    Maricunga 39   79 15 12 0  
    La Coipa 149   142.6 18.2 18.9 20.2  
  Non-hazardous Waste Disposed Onsite (Tonnes)              
    Paracatu 892   1,427 1,574 1,537 997  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 2,248   3,308 2,672 1,727 n/r  
    La Coipa 533   490 150 160 n/r  
  Non-hazardous Waste Disposed Offsite (Tonnes)              
    Paracatu 1,186   239 162 150 98  
    Crixás n/r   n/r n/r n/r n/r  
    Maricunga 0   0 0 0 0  
    La Coipa 0   0 0 0 0  
 
n/r = not reported
 
Regional Information – Russian Operations
Operations       2009 2008 2007
 
Kupol
  Mining Method: Open Pit and Underground              
  Processing Method: Merrill-Crowe              
  Employees       1,023 988 555  
  Contractors       268 283 477  
  Ore Processed (Tonnes)13       1,144,000 618,000 0  
  Gold Production (Gold equivalent ounces)       925,507 626,543 0  
 
13 Represents 100% basis of tonnes of ore processed.
 
Regional Performance Statistics – Russia
Safety       2009 2008 2007
 
  Fatalities (Number)              
    Kupol       2 1 0  
  Lost-time Injury Frequency Rate              
    Kupol       0.28 0.74 1.27  
  Restricted Work Activity Frequency Rate              
    Kupol       0.21 0.17 0.00  
  Medical Treatment Frequency Rate              
    Kupol       0.63 0.50 0.68  
 
Environmental
 
General (100% basis)
  Number of Regulatory Actions              
    Kupol       0 0 1  
  Fines Paid (US$)              
    Kupol       0 0 1,090  
    Other       0 0 4,029  
  Reportable Releases (m3)              
    Kupol       2 0 0  
    Other       0 0 1  
 
Energy/Greenhouse Gas
  Total Energy Consumption in Gigajoules              
    Kupol       682,000 888,000 362,000  
  Direct Energy Consumption in Gigajoules              
    Kupol       682,000 888,000 362,000  
  Indirect Energy Consumed in Gigajoules              
    Kupol       0 0 0  
  Energy Consumed per Tonne Ore Processed (Megajoules/Tonne)        
    Kupol       596 1,369  
  Greenhouse Gas Emissions (Tonnes)        
    Kupol       50,100 65,200 26,600  
  Greenhouse Gas Emissions per Tonne of Ore Processed (Kilograms/Tonne) 43.8 100.5  
 
Water Use
  Total Water Withdrawn – Groundwater (m3)        
    Kupol       17,800 107,000 37,500  
  Total Water Withdrawn – Surface Water (m3)        
    Kupol       230,000 327,000 54,900  
  Total Precipitation Collected (m3)        
    Kupol       488,000 403,000 0  
  Total Water Consumed in Ore Processing (m3)        
    Kupol       623,000 140,000 0  
  Water Consumed per Tonne of Ore Processed (Litres/Tonne)        
    Kupol       545 216  
  Total Water Discharged – Groundwater (m3)        
    Kupol       0 0 0  
  Total Water Discharged – Surface Water (m3)        
    Kupol       1,800 23,300 37,600  
 
Land Status (100% basis)
  New Reclamation (hectares)        
    Kupol       11 7 663  
  Previously Reclaimed (hectares)        
    Kupol       670 663 0  
  New Disturbance (hectares)        
    Kupol       162 0 907  
  Previously Disturbed (hectares)        
    Kupol       226 237 0  
 
Significant Materials Use
  Diesel Fuel (m3)        
    Kupol       18,000 23,600 9,600  
  Cyanide (Tonnes as CN)        
    Kupol       540 336 0  
  Lime (Tonnes)        
    Kupol       10,037 6,134 0  
  Blasting Agents (Tonnes)        
    Kupol       2,626 1,827 1,338  
 
Wastes
  Waste Rock Mined (Tonnes)        
    Kupol       2,237,000 1,227,000 2,762,000  
  Tailings Produced (Tonnes)        
    Kupol       858,000 486,000 0  
  Hazardous Waste Disposed Onsite (Tonnes)        
    Kupol       0 0 0  
  Hazardous Waste Disposed Offsite (Tonnes)        
    Kupol       28.5 1.7 0  
  Non-hazardous Waste Disposed Onsite (Tonnes)        
    Kupol       956 582 4,105  
  Non-hazardous Waste Disposed Offsite (Tonnes)        
    Kupol       0 0 0